Thursday 22 June 2017

Draft Lumion



 The development of my project was fairly smooth, with solutions to issues found relatively easily.

The biggest change that was made was the transition of the lecture hall to the top floor, as seen between these two sets of photos. Initially the computer lab was going to be on the top floor, however I realized that the roof was not high enough on the middle floor to allow for a lecture hall, and thus I changed the model to isolate the lecture hall on the top floor, as seen in the bottom set of images.


No comments:

Post a Comment